Our bar screen references
Over the years, F.B. Procédés bar screens have proved themselves, and attracted and satisfied customers all over France. Click on a département on the map below to discover the corresponding references.
EXAMPLES OF BAR SCREEN INSTALLATIONS
On this page, you will find some examples of our know-how and, above all, the great adaptability of our range of bar screens. Indeed, whatever the case, FB Procédés bar screens constitute a simple and efficient solution avoiding civil engineering modifications. Click on the table below to bring up the pictures.
-
Bar screen - Grasse - Marigarde Station, with Lyonnaise des Eaux (06)
-
September 2007:
Replacement of a manual screen by a bar screen, type XG12, and creation of a grating platform for access to the bar screen.
-
Bar screens - Besancon, with City of Besançon (25)
-
November 2007:
Replacement of two competitor’s bar screens by two XG12 automatic bar screens and an electrical control unit and servo control.
-
Bar screen - Brest - Moulin à Poudre Station (29)
-
March 2006:
Installation of an NG11 bar screen and a “Rotosieve KP200” compactor with waste evacuation tubing and automatic bagging system.
| BEFORE |
AFTER |
 |
 |
-
Bar screen - Pont Saint Esprit, with Ferelec (30)
-
July 2009:
Replacement of a fixed screen by an assembly composed of an XG12 automatic bar screen and a band conveyor with vertical waste evacuation tubing at its exit.
-
Bar screens - Pont Saint Esprit – Pumping Station, with Saur (30)
-
June 2009:
Replacement of a fixed screen by six automatic bar screens, type XG12, and setting up of a bar screen access platform in grating's panels with guard rail.
| BEFORE |
AFTER |
 |
 |
-
Bar screens - Portiragnes – Pumping station, with Boisson (34)
-
February 2004:
Replacement of two competitor's bar screens by two XG12 automatic bar screens, and an electrical control unit and servo control.
-
Bar screen - Noyal sur Vilaine, with Véolia Eau (35)
-
June 2009:
Replacement of competitor's inclined bar screen by an XG12 automatic bar screen.
-
Bar screens - Rennes - Beaurade station, with city of Rennes (35)
-
October 2002 and March 2003:
Installation of two NG11 automatic bar screens adapted to the existing one and, for each bar screen, a grating footbridge equipped with guard rails and vertical tubing to evacuate waste.
-
Bar screen - Chateaugiron, with Véolia Eau (35)
-
May 2006:
Replacement of a competitor’s bar screen by an NG21 automatic bar screen associated with an existing piston compactor. The operating conditions of the whole system were considerably optimised.
| BEFORE |
AFTER |
 |
 |
-
Bar screens - Saint Pierre de Boeuf – Water manhole with Compagnie Nationale du Rhône (42)
-
March 2009 :
Replacement of fixed screens by two XG12 automatic bar screens.
| BEFORE |
AFTER |
|

|

|
-
Bar screen - La Chapelle des Marais, with la Carène (44)
-
November 2003:
Installation of an assembly composed of an SG400 automatic bar screen and a "Rotosieve" screw compactor. Installation of stairway for bar screen access, with grating and guard rail.
| BEFORE |
AFTER |
 |
 |
-
Bar screen - Saint Nazaire –Porcé pumping station, with Sovep (44)
-
April 2007:
Replacement of a manual screen by an XG12 automatic bar screen and a screw compactor.
| BEFORE |
AFTER |
 |
 |
-
Bar screen - Saint Nazaire - Sautron Station, with la Carène (44)
-
October 2009:
Replacement of a competitor's bar screen by an NG11 automatic bar screen working with an existing screw compactor. The operating conditions were considerably optimised.
| BEFORE |
AFTER |
 |
 |
-
Bar screen - Nivillac, with Véolia Eau (56)
-
April 2006:
Replacement of a competitor's curved bar screen by an SG400 automatic bar screen and a screw compactor with an automatic bagging system.
| BEFORE |
AFTER |
 |
 |
-
Bar screen - Muzillac, with Véolia Eau (56)
-
April 2006:
Replacement of a competitor's bar screen by an SG400 automatic bar screen and a screw compactor with an automatic bagging system.
| BEFORE |
AFTER |
 |
 |
-
Bar screen - Beauchene, with Vélia Eau (61)
-
December 2006:
Replacement of a competitor’s inclined bar screen by an XG12 automatic bar screen.
| BEFORE |
AFTER |

|
 |
-
Bar screen - Loué - LDC abattoir, with Véolia Eau (72)
-
March 2006 :
Installation of an NG21 automatic bar screen equipped with a motorised brush to clean the comb, a cleaning ramp and a screw conveyor.
| BEFORE |
AFTER |
 |
 |
-
Bar screen - Evron - Abattoir, with Véolia Eau (72)
-
January 2007 :
Installation of an NG21 automatic bar screen equipped with a motorised brush to clean the comb, and a cleaning ramp.
-
Bar screen - Provins, with Véolia Eau (77)
-
October 2009 :
Replacement of a fixed screen by an NG11 automatic bar screen with its framework beams and its trash container.
-
Bar screens - Le Pontet – Pumping station, with Sogea (84)
-
May 2005:
Replacement of fixed screens by an assembly of 4 NI13 bar screens and a band conveyor. Setting up of a footbridge for bar screen access, with guard rail.
-
Bar screen - Saint Fulgent, with Véolia Eau (85)
-
June 2007:
Replacement of a competitor's curved bar screen by an NG11 automatic bar screen and a VCP200 screw compactor with a bagging system.
| BEFORE |
AFTER |
 |
 |
-
Bar screen - Chaillé sous les Ormeaux, with Véolia eau (85)
-
October 2009 :
Replacement of a fixed screen by an SG400 automatic bar screen. Setting up of grating walkway for bar screen access.
|
|