Over the years, F.B. Procédés bar screens have proved themselves, and attracted and satisfied customers all over France.
Click on a département on the map below to discover the corresponding references.


map

EXAMPLES OF BAR SCREEN INSTALLATIONS

On this page, you will find some examples of our know-how and, above all, the great adaptability of our range of bar screens.
Indeed, whatever the case, FB Procédés bar screens constitute a simple and efficient solution avoiding civil engineering modifications.
Click on the table below to bring up the pictures.

Bar screen - Grasse - Marigarde Station, with Lyonnaise des Eaux (06)

September 2007:

Replacement of a manual screen by a bar screen, type XG12, and creation of a grating platform for access to the bar screen.

BEFORE AFTER
fb procedes Grasse 1 fb procedes Grasse 2
fb procedes Grasse 3
Bar screens - Besancon, with City of Besançon (25)

November 2007:

Replacement of two competitor’s bar screens by two XG12 automatic bar screens and an electrical control unit and servo control.

BEFORE AFTER
fb procedes Besançon 1 fb procedes Besançon 3
fb procedes Besançon 2 fb procedes Besançon 4

Bar screen - Brest - Moulin à Poudre Station (29)

March 2006:

Installation of an NG11 bar screen and a “Rotosieve KP200” compactor with waste evacuation tubing and automatic bagging system.

BEFORE AFTER
fb procedes Brest  1 fb procedes Brest  2
Bar screen - Pont Saint Esprit, with Ferelec (30)

July 2009:

Replacement of a fixed screen by an assembly composed of an XG12 automatic bar screen and a band conveyor with vertical waste evacuation tubing at its exit.

BEFORE AFTER
fb procedes Pont St Esprit 1

fb procedes Pont St Esprit 4

fb procedes Pont St Esprit 2 fb procedes Pont St Esprit 5

Bar screens - Pont Saint Esprit – Pumping Station, with Saur (30)

June 2009:

Replacement of a fixed screen by six automatic bar screens, type XG12, and setting up of a bar screen access platform in grating's panels with guard rail.

BEFORE AFTER
fb procedes Pont St Esprit b 3 fb procedes Pont St Esprit b 4
Bar screens - Portiragnes – Pumping station, with Boisson (34)

February 2004:

Replacement of two competitor's bar screens by two XG12 automatic bar screens, and an electrical control unit and servo control.

BEFORE AFTER
fb procedes Portiragnes 1 fb procedes Portiragnes 4
fb procedes Portiragnes 2 fb procedes Portiragnes 3
Bar screen - Noyal sur Vilaine, with Véolia Eau (35)

June 2009:

Replacement of competitor's inclined bar screen by an XG12 automatic bar screen.

BEFORE AFTER
fb procedes Noyal sur Vilaine 1 fb procedes Noyal sur Vilaine 2
fb procedes Noyal sur Vilaine 3
Bar screens - Rennes - Beaurade station, with city of Rennes (35)

October 2002 and March 2003:

Installation of two NG11 automatic bar screens adapted to the existing one and, for each bar screen, a grating footbridge equipped with guard rails and vertical tubing to evacuate waste.

 

BEFORE AFTER
fb procedes Rennes – Station de Beaurade 1 fb procedes Rennes – Station de Beaurade 2 fb procedes Rennes – Station de Beaurade 3
Bar screen - Chateaugiron, with Véolia Eau (35)

May 2006:

Replacement of a competitor’s bar screen by an NG21 automatic bar screen associated with an existing piston compactor. The operating conditions of the whole system were considerably optimised.

BEFORE AFTER
fb procedes Chateaugiron 1 fb procedes Chateaugiron 2
Bar screens - Saint Pierre de Boeuf – Water manhole with Compagnie Nationale du Rhône (42)

March 2009 :

Replacement of fixed screens by two XG12 automatic bar screens.

BEFORE AFTER

fb_procedes_st_pierre_de_boeuf_1

st_pierre_de_boeuf_2

Bar screen - La Chapelle des Marais, with la Carène (44)

November 2003:

Installation of an assembly composed of an SG400 automatic bar screen and a "Rotosieve" screw compactor. Installation of stairway for bar screen access, with grating and guard rail.

BEFORE AFTER
fb procedes La Chapelle des Marais 1 fb procedes La Chapelle des Marais 2
Bar screen - Saint Nazaire –Porcé pumping station, with Sovep (44)

April 2007:

Replacement of a manual screen by an XG12 automatic bar screen and a screw compactor.

BEFORE AFTER
fb procedes St Nazaire PR de Porcé  1 fb procedes St Nazaire PR de Porcé  2
Bar screen - Saint Nazaire - Sautron Station, with la Carène (44)

October 2009:

Replacement of a competitor's bar screen by an NG11 automatic bar screen working with an existing screw compactor. The operating conditions were considerably optimised.

BEFORE AFTER
fb procedes St Nazaire STEP Sautron 1 fb procedes St Nazaire STEP Sautron 2
Bar screen - Nivillac, with Véolia Eau (56)

April 2006:

Replacement of a competitor's curved bar screen by an SG400 automatic bar screen and a screw compactor with an automatic bagging system.

BEFORE AFTER
fb procedes Nivillac 1 fb procedes Nivillac 2
Bar screen - Muzillac, with Véolia Eau (56)

April 2006:

Replacement of a competitor's bar screen by an SG400 automatic bar screen and a screw compactor with an automatic bagging system.

BEFORE AFTER
fb procedes Muzillac 1 fb procedes Muzillac 2
Bar screen - Beauchene, with Vélia Eau (61)

December 2006:

Replacement of a competitor’s inclined bar screen by an XG12 automatic bar screen.

BEFORE AFTER
fb procedes beauchene 1
fb procedes beauchene 2
Bar screen - Loué - LDC abattoir, with Véolia Eau (72)

March 2006 :

Installation of an NG21 automatic bar screen equipped with a motorised brush to clean the comb, a cleaning ramp and a screw conveyor.

BEFORE AFTER
fb_procedes_lou_1 fb_procedes_loue_2
Bar screen - Evron - Abattoir, with Véolia Eau (72)

January 2007 :

Installation of an NG21 automatic bar screen equipped with a motorised brush to clean the comb, and a cleaning ramp.

BEFORE AFTER
fb procedes evron 1 fb procedes evron 3
fb procedes evron 2

fb procedes evron 4

Bar screen - Provins, with Véolia Eau (77)

October 2009 :

Replacement of a fixed screen by an NG11 automatic bar screen with its framework beams and its trash container.

BEFORE AFTER
fb procedes provins 3.jpg
fb procedes provins 2
fb procedes provins 1
Bar screens - Le Pontet – Pumping station, with Sogea (84)

May 2005:

Replacement of fixed screens by an assembly of 4 NI13 bar screens and a band conveyor. Setting up of a footbridge for bar screen access, with guard rail.

BEFORE AFTER
fb procedes Le Pontet 1 fb procedes Le Pontet 3
fb procedes Le Pontet 2

fb procedes Le Pontet 4

Bar screen - Saint Fulgent, with Véolia Eau (85)

June 2007:

Replacement of a competitor's curved bar screen by an NG11 automatic bar screen and a VCP200 screw compactor with a bagging system.

BEFORE AFTER
fb procedes St Fulgent 1 fb procedes St Fulgent 2
Bar screen - Chaillé sous les Ormeaux, with Véolia eau (85)

October 2009 :

Replacement of a fixed screen by an SG400 automatic bar screen. Setting up of grating walkway for bar screen access.

BEFORE AFTER
fb procedes Chaillé sous les Ormeaux 1 fb procedes Chaillé sous les Ormeaux  3
fb procedes Chaillé sous les Ormeaux 2

fb procedes Chaillé sous les Ormeaux  4